|
|
||||||||||||||||||||||||||||||||||||||
|
Oklahoma Cleanup Standards
for Hydrocarbon Contaminated Groundwater
Note: Oklahoma uses a Risk Analysis in determining cleanup standards on a site-by-site basis. * Whatever method is specified must be able to detect the most stringent cleanup levels. EPA Method 418.1 is not accepted testing method for TPH. Contact: Dick Oppel, Oklahoma Corporation Commission, Underground Storage Tank Program, 405-522-5264 Top |
||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||
|
Design and hosting by Web
Studio Designs & Pioneer
Host Internet Solutions |