|
|
||||||||||||||||
|
Arkansas Cleanup Standards
for Hydrocarbon Contaminated Groundwater
*
VOC scan may be required where contamination by
chlorinated or other solvents is possible or suspected. TCLP for metals
may be required at the discretion of the case manager. ** Clean-up requirements will be site-specific,
after consideration of risk according to the ASTM or other accepted risk
assessment protocol. Note:
Hydrocarbon remediation program for both soil and
groundwater is now based on ASTM E 1739 Contact:
James Atchley, Arkansas Department of Environmental
Quality, 501-682-0972 Web Site: http://www.adeq.state.ar.us Top |
||||||||||||||||
|
Design and hosting by Web
Studio Designs & Pioneer
Host Internet Solutions |