|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Alabama
Cleanup Standards for Hydrocarbon Contaminated Soil
(1) TPH analyses are required for closure site
assessments. COC testing is optional during closure site assessment. (2) COC (Chemicals of Concern) testing is required
for preliminary and secondary investigations only. *Dictated by Method ** Risk Assessment may be utilized for an alternate
corrective action limit. Note:
The ADEM (Alabama Department of Environmental Management) UST program has
developed a risk-based program. Cleanup levels can vary from the above
listed values when a risk-based evaluation is made which can support
alternate Contact:
Dorothy Malaier, Alabama Department of Environmental Management,
334-270-5613 E-mail: dsm@adem.state.al.us Web site: http://www.adem.state.al.us
Top |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Design and hosting by Web
Studio Designs & Pioneer
Host Internet Solutions |